-
Irakli Kobakhidze:
The total installed capacity of the hydroelectric power plants built in 2007-2012 is eight megawatts whilst the total installed capacity of the hydroelectric power plants built in 2013-2016 is 415 megawatts
29/05/2017Mostly TrueThe application is accurate, but requires additional information and/or definition
Commercial Bank Debtors
-
“Forty percent of Georgia’s population l...
Half TrueThe statement is partly accurate, but the details are missing or some of the issues are without context -
“The economic gap between Georgia and Mo...
Mostly TrueThe application is accurate, but requires additional information and/or definition -
“Georgia’s economy has become tied to Ru...
Without verdictThe verification of the application can not be evaluated