-
Irakli Kobakhidze:
The total installed capacity of the hydroelectric power plants built in 2007-2012 is eight megawatts whilst the total installed capacity of the hydroelectric power plants built in 2013-2016 is 415 megawatts
29/05/2017Mostly TrueThe application is accurate, but requires additional information and/or definition
Commercial Bank Debtors
-
Volume of Foreign Direct Investment in A...
LieThe statement is inaccurate and the assertion in it is absurd -
“Trade turnover between Georgia and Arme...
Mostly TrueThe application is accurate, but requires additional information and/or definition -
“Annual trade turnover with the United S...
Half TrueThe statement is partly accurate, but the details are missing or some of the issues are without context